Capabilities
Cadastral Surveys
Cadastral surveys are performed to document land ownership. They require field survey and either recovery of historic boundary information or often in Alaska we are called upon to perform original surveys.
We have many experienced land surveyors and are licensed in Alaska, Texas and Washington to perform these surveys.
Related Projects:
- NOAA - Alaska IDIQ Contract for Hydrographic Surveys and Related Services
- Various Locations, Alaska
- Since 1998, we have supplied the U.S. Department of Commerce, National Oceanic and Atmospheric Administration (NOAA) with hydrographic data of 100% bottom coverage with shallow-water multibeam sonar systems.

- more »
- USACE - Alaska IDIQ Contract for Hydrographic Surveys and Related Services
- Various Locations, Alaska
- Since 1995, we have provided the U.S. Army Corps of Engineers (USACE) - Alaska District with hydrographic, topographic, and Global Positioning System (GPS) control surveys; aerial photography; LiDAR mapping; and tide studies on over five hundred projects throughout Alaska.

- more »
- Harbor Mountain Road Design
- Sitka, Alaska
- We were contracted by the U.S. Department of Agriculture U.S. Forest Service, Alaska Region to perform a preliminary line survey and hydro-site surveys in preparation for the engineering upgrade design of an existing 4.8 mile (7.6 kilometer) mountain road used as the primary access to public recreational facilities.

- more »
- Submarine Transmission Cable Installation
- Cook Inlet, Alaska
- We provided surveying and positioning services to support a 138-kilovolt (kV) submarine cable installation project. These services included a desk-top study, a pre-lay marine survey, a post-lay survey, Global Positioning System (GPS) control survey, and other support services during construction.

- more »
- Mine Debris Consolidation and Disposal
- Southwestern, Alaska
- Our surveyors conducted field surveys for the Bureau of Land Management (BLM) Red Devil Mine Debris Consolidation and Disposal project, then measured and established limits for the excavation of two monofill sites.

- more »

